The Renon cable railway
Technical monument,
39054
Ritten / Renon
|
The Renon cable railway
In September 2007 the cable railway was shut down and was replaced by a modern cable car in 2009. This modernisation contributed to increasing the number of passengers transported per hour from 250 to 550. Besides passengers, the cable car can also be used for the transport of strollers and bicycles.
The Renon cable railway, alike the railway of the Val Venosta valley, and the Mendola funicular are part of the local transport system of Alto Adige.
The Renon cable railway, alike the railway of the Val Venosta valley, and the Mendola funicular are part of the local transport system of Alto Adige.
Share this link with your friends